Projects

Nettles Island List of Updates to Common Property
If you would like to review the paperwork, please fill out a Records Request Form and submit it to the Condo Office

2025

2024

  • North Dead End Canal Seawall Project​

  • East Rec Hall Door Operator

  • Fitness Center AC Duct

  • Fitness Center Renovation

  • Gate House Bathroom Renovation

  • Gate House drainage updates

  • Condo Office & Bocce Courts awnings replaced

  • Repairs to all three (3) bridges

  • Upgrades to Gate House system

  • Ocean Pool building roof replaced

  • New pool furniture

2023

  • Grand Canal South seawall replacement

  • Bath House 2 roof replaced and water heater replaced

  • Celebrity Bridge road repairs

  • Chlorine systems at both pools replaced

  • Condo Office flooring replaced

  • One (1) elliptical machine in fitness center

  • Electrical upgrades in islands at front entrance

  • H piles removed from water along north wall

  • Maintenance yard repaved

  • New chair lift for Rec Pool

  • Repairs to Ocean Pool fencing due to storm damage

  • Rec Hall Main Hall #1 A/C compressor replaced

  • Rec Poll new heater

  • Seawall repairs at Lots 257/258

  • Seawall repairs at Lot 43

  • Library A/C replaced

  • Ocean Pool cameras upgraded

  • Barcode reader at entrance replaced

  • Nettles 2011 truck replaced with 2020 truck

  • Carpeting at east and main entrances to Rec Hall replaced

2022

  • FPL installed new LED street lights

  • Commercial area fence partially replaced

  • Fitness Center A/C replaced

  • Rec Hall Main Hall #2 A/C replaced

  • Rec Hall 1st floor bathrooms vanities & sinks replaced​

  • Rec Hall 1st floor four (4) showers replaced

  • Rec Hall 1st floor flooring replaced & walls painted

  • New ice machine at Rec Hall exterior

  • Rec Pool new heater

  • Seawall study performed

  • Gate House cameras upgraded

  • New pool furniture

  • New server for Condo Office

  • Grand Canal South Seawall replacement started

2021

  • New sound system in Rec Hall

  • New shower tower at the Ocean/Pool entrance

  • Condo Office A/C replaced

  • New main pool pump & control at Ocean Pool

  • East Rec Hall A/C replaced

  • 2 Fire Hydrants replaced

  • Rebuild roll down awnings at Ocean Pool

  • Exterior painting of Rec Hall & mailbox building

  • Replaced Bath House 7 rain gutters

2020

  • Tennis court fence replacement & new synthetic carpet installed

  • New ceramic kiln purchased

  • French drain installed at tennis court

  • New pump room at the Rec Pool/Hot Tub area

  • New basketball court

  • New pump room at the Ocean Pool

  • Fence between Pickleball & basketball courts

  • Rec Hall new front windows downstairs

2019

  • New fence at front wall/A1A

  • New handicap ramp at Rec Hall

  • New fire alarm system at the Rec Hall & Condo Office

  • Blue Stream cable installed

  • New garage doors installed in maintenance area

  • Bath House #5 & #14 roofs replaced

2018

  • New fence at Ocean Pool walkway

  • Replaced six (6) 1 HP pumps with 2 HP Grinders

  • New maintenance yard gates

  • New fenced at Ocean Pool parking lot north side

2017

  • Installation of concrete Pickleball Court

  • Resurfacing of Shuffleboard Court

  • Modification to Horseshoe Pitching Area

  • Installation of awning over kiddie pool

  • Renovations to Bathhouse #15

  • Replacement of roofs/shingles at Main Rec Hall and 4 bath houses

  • Modifications to security cameras

  • Replacement of solar panel over Clubhouse needed for roof replacement

  • Repainting (electrostatic paint process) of mail boxes

  • Modifications to wood walking/wheelchair ramp leading to second floor of Clubhouse

  • Rebuilding of one sewer system lift station

  • Replaced three (3) 1 HP pumps with 2 HP grinders

2016

  • Replacement of door to Library in Clubhouse

  • Restriping of parking lot at Clubhouse

  • Modifications to flowerbeds at Clubhouse parking lot

  • Upgraded sound board in Main Rec Hall

  • Replacement of water heater at Main Rec Hall

  • Replace Library A/C

  • Replace East Rec Hall A/C

  • Culvert repair using CIPP - Lot 47

  • New ice machine at recycle area

  • Replace one (1) 1 HP pumps with 2 HP grinders

2015

  • New PVC privacy fence added to Horseshoe Pit area

  • Replaced carpeting in exercise room

  • New composite seawall in west canal, section 1

  • New stairs added to ocean dune

  • Culvert repair using CIPP - Lot 1293

  • Replace two (2) 1 pumps with 2 HP grinders

2014

  • New 30 ton AC added to Main Rec Hall

  • Replaced flooring in East Rec Hall and new sliding glass door

  • Resurface kitchen counter tops in Main Rec Hall

  • Replaced back porch A/C

  • Replaced rec pool pump room fence

  • Replaced south side railing main causeway bridge

  • Replaced north side bridge brackets for utilities

  • Jacketed approx. 170 batter piles on perimeter seawalls

2013

  • Replaced fencing around ocean pool

  • New metal pan roof over pool pump room

  • New fabric awning added to main office entrance

  • Bocce court resurfaced

  • Sidewalk repair on main bridge

2012

  • Build out of offices and mezzanine in existing Maintenance Building

  • Handicap lifts for pools purchased

2011

  • New fabric awning added to kids sandbox

  • Flagpole replaced at Gate House

  • Replaced metal pan roof over shuffleboard courts

  • Added Beach Stairs at ocean dune

2010

  • New steel seawall added to Lots 1232, 43 & 148

  • New fabric awning added to Eat in area of Rec Hall Pool

  • Replace top covers on 5 lift stations

2009

  • Installation of railing on Porpoise Bridge

  • Ocean Cabana Shutters added

2008

  • Green vinyl coated fencing added to ends of Horseshoe pits

  • Repairs to main causeway bridge

2007

  • Rebuilding of one sewer system lift station

  • Rebuild Porpoise bridge structure and & 2880 L.F. of seawall with new steel sheet pile

2006

  • Replacement and installation of tile flooring in Clubhouse restrooms

  • Replacement of restroom stall walls in Clubhouse

  • Replacement of railing on Celebrity Bridge

2005

  • Installation of elevator in Clubhouse

  • Replace concrete block retaining wall at ocean face of pool area following hurricanes

  • Restore Porch Roof and damaged portions of building at Ocean Cabana building following hurricanes

2004

  • Addition of steel seawall for emergency hurricane repairs various locations

2002

  • Remodeling of second floor restrooms in Clubhouse

  • Water distribution system moved from rear five feet of unit property to roads

  • Replace 540 L.F. of seawall cap in Main Canal

  • Re-decked boardwalk at Ocean

  • Rec Hall east side exterior stairwell railing replaced

2000

  • New steel seawall added to North Dead End Canal

  • Rebuild new gate house

1998

  • Construction of building near Clubhouse for Post Office Boxes

  • Remodeling of first floor restrooms in Clubhouse

  • Remodeled Ocean Pool Bathrooms

1997

  • Resurfaced Hot Tubs from fiberglass to gunite/diamond brite

  • Installed new paver deck and diamond brite at Rec Hall Pool

1995

  • Replacement of 7500 L.F. of perimeter seawalls

1990

  • New seawall cap and batter piles added to east perimeter seawall

1985

  • Bocce ball court added

1984

  • Installation of a wood walking/wheelchair ramp leading from recreation hall/pool area to mail/walkway

1982

  • Construction of guard house

1980

  • Installation of road drains

Prior to 1975

  • Construction of Nettles Island begins

  • Dredging of the river and canals to construct the Island

  • Construction of causeway leading to island

  • Construction of front entrance sign

  • Construction of seawalls

  • Construction of beach pool and cabana

  • Construction of guard house

  • Construction of recreation hall

  • Installation of electric cables